ClarkDietrich® Easy Embedment System™ and the Orlando Airport South Terminal Expansion
Feb 3, 2022
Share

FWCCA, The Inside Straight - January 2022

ClarkDietrich Easy Embedment System™ (EES) - Brings Ease And Confidence To Orlando Airport Expansion
As featured in the January 2022 article in the FWCCA The Inside Straight, outlined by Christopher K. Little, learn about how ClakDietrich assisted in the $4.1 billion expansion of the Orlando International Airport (MCO) South Terminal with use of our Easy Embedment System. The project included 164,000 square feet of exterior stucco. Read the full article here.
Recent Posts
Oct 11, 2016A First-Hand Account of a Life-Changing Trip
Nov 18, 2016TRAKLOC® Helps Revive Historic Jung Hotel
Nov 18, 2016Balancing a New Career with an Old Passion