RedHeader PRO™ Rough Opening System
provides versatility for walls and ceilings contractors
Designed to replace conventional boxed headers and built-up jambs and provide better results in half the time.
Quick Actions:
RedHeader PRO™ Framing system
This system provides versatility for walls and ceilings contractors. Most notably, RedHeader PRO uses the same-sized member for the jamb and header. This allows for even greater functionality, while still reducing the amount of material by up to 50 percent. RedHeader PRO also eliminates “capped” members, which allows fasteners to drive through only a single thickness of steel.
Contractors will also notice that the top of the header is open and the header and jamb assembly are flush. This design allows for easy install of the insulation while virtually eliminating the need to pre-insulate headers prior to installation.
The new HDSC Header Bracket uses less steel than the original blue Drop ’N Lock™ Clip. The combination of a more economical shape and the elimination of the painting process is also in keeping with our green initiative.
RedHeader PRO™ can cut your labor time in half.
It’s designed to replace conventional boxed headers and built-up jambs and provide better results in half the time. One-piece headers and jambs eliminate the additional studs, track and screws required to frame conventional rough openings. Headers and jambs are also pre-cut to specified lengths to eliminate field cutting.
Construction Advantages:
- Eliminates built-up jambs and boxed or lay-in headers.
- Reduces material pieces and screws by up to 50%.
- The header easily slides into the HDSC Clip.
- Eliminates "capped" members, allowing drywall screws to drive through only one thickness of material.
- Header stud allows for easier fit of rigid insulation without additional cutting.
- Opened jamb stud does not require pre-insulating.
- SAVES LABOR in installation and handling!
Product Data & Ordering Information
- Pre-cut headers (4' 0" and over) available standard, based on minimum quantity orders.
- Minimum quantity orders of 30 headers required.
- HEADER LENGTHS SHOULD BE ORDERED 1/2" SHORTER THAN OPENING WIDTH TO FIT INSIDE CLIPS (Header Length = Inside of Jamb to Inside of Jamb Minus 1/2").
- Punching of jamb studs available upon request
RedHeader PRO Stud Profile information
| Product Code | Web Size (A) |
Flange (B) |
Return Lip (C) |
Mils (ga) |
|---|---|---|---|---|
| 362PRO300 | 3-5/8" | 3" | 1" | 33, 43, 54, 68 or 97 |
| 362PRO350 | 3-5/8" | 3-1/2" | 1" | 54, 68 or 97 |
| 400PRO300 | 4" | 3" | 1" | 33, 43, 54, 68 or 97 |
| 400PRO350 | 4" | 3-1/2" | 1" | 54, 68 or 97 |
| 600PRO300 | 6" | 3" | 1" | 33, 43, 54, 68 or 97 |
| 600PRO350 | 6" | 3-1/2" | 1" | 54, 68 or 97 |
| 800PRO300 | 8" | 3" | 1" | 33, 43, 54, 68 or 97 |
| 800PRO350 | 8" | 3-1/2" | 1" | 54, 68 or 97 |
Thickness:
- 33mils (20ga) 33 ksi
- 43mils (18ga) 33 ksi
- 54mils (16ga) 50 ksi
- 68mils (14ga) 50 ksi
- 97mils (12ga) 50 ksi
All material CP60 (CP90 available)
Header lengths should be ordered 1/2" shorter than opening width to fit inside HDSC Clips (Header Length = Inside of Jamb to Inside of Jamb Minus 1/2")
ALL HEADERS ARE UNPUNCHED.
Jamb Profile
ALL JAMBS STUDS ARE UNPUNCHED. PUNCHED JAMB STUDS AVAILABLE UPON REQUEST.
HDSC Header Bracket (HDSC)
The perfect complement to the RedHeader PRO™ and HDS® Framing system. This simple, yet innovative header bracket turns curtain-wall header installation from a two-person job into a one-person job. This unique, pre-punched clip also eliminates surface head fastener buildup that can create finishing challenges.
Visit the HDSC Header Bracket Product Page For more infomation
Header Cripple Stud Clip
Why use a Cripple Stud Clip with the RedHeader Pro or HDS System?
- Eliminates the header track material and is a more economical alternative
- Extra long return legs on RedHeader PRO or HDS allows for ease of attachment
- Top of header is open, allowing for easy install of the insulation. No need to "pre-insulate" headers prior to installation












